Framework Assessment

1
Framework Assessement
11 questions
The following criteria will be used to evaluate project-based work. They are divided in 3 areas: • The Project: all the criteria related to the idea developed by the team • The Process: criteria related to the performance of the group • Bonus: some further assets of the teamwork to which give some more value. Each of these elements is equally important in evaluating the group's work, for almost all criterion there is a maximum of 5 points, except for bonus, where the points are one for each criteria.
Enrolled: 0 students
Lectures: 0

Archive

Framework Assessment